# # arev:/usr/local/unicat/unireq/beamreq/req00013.txt # UNICAT Member Beam Time Request #13 # created Wed Mar 11 10:15:45 CST 1998 # days: 2 description: Installation of Storage Ring machine status link panel and RGA and calibration of the DSP equipment+required: Just the white beam part of the beam line experiment: DSP calibration name: Pete Jemian new+request: on nonmembers: Mohan and Marty Smith station: 33ID-D unacceptable+dates: We need two eight-hour shifts, about a week apart. Shift 1 is to take the data. Shift 2 is to test the calibration. #QUERY_STRING: #REMOTE_HOST: atl.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.26 #CONTENT_LENGTH: 428 #HTTP_REFERER: http://unicat.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.04 [en] (Win95; I)