# # arev:/usr/local/unicat/unireq/beamreq/req00138.txt # UNICAT Member Beam Time Request #138 # created Fri Sep 22 16:51:47 CDT 2000 # collaboration: No contact: jemian@anl.gov days: 2 description: Our experience in setting up the USAXS shows us that we need at least 8 hours before the equipment is ready to run users' samples. We also will test the use of scintillation counters with the USAXS to measure the signal from weakly scattering samples and to assess the overlap with the existing photodiode detector. We will use USAXS standard samples for these measurements. We also will tune the MicroMo servo motor controller used to provide rough Bragg angle position for the second analyzer crystal (motor=A2R, fine positioning is provided by a piezo=A2Rp). This beam time should be the first during the USAXS run. After the MRS meeting would be the best time for the USAXS run. Perhaps, the last week of the scheduling cycle? equipment+required: usual USAXS equipment, scintillation counter experiment: USAXS equipment setup and development foreign+nationals: hazards: no hazards name: Pete Jemian new+request: on nonmembers: station: 33ID-D unacceptable+dates: Jan will be gone October 18 till November 17 and then on MRS meeting (Boston) - November 27 till December 1. #QUERY_STRING: #REMOTE_HOST: zrh.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.36 #CONTENT_LENGTH: 1270 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.72 [en] (Windows NT 5.0; I)