# # top.uni.aps.anl.gov:/home/www/beamtime-requests/req00235.txt # UNICAT Member Beam Time Request #235 # created Tue Dec 04 11:54:04 CST 2001 # beamline: 33BM collaboration: Yes collaborator+Jenia: on collaborator+Pete: on contact: srbare@uop.com days: 4 description: We wish to continue our evaluation of 33Bm for XAFS experiments. The specifics of the experiments will be determined to some extent by the status of the line, i.e. will bender be operational, will feedback be operational. The general experiment is to conduct in situ reduction on supported metal catalysts while observing the EXAFS. equipment+required: EXAFS equipment experiment: In situ EXAFS experiments foreign+nationals: None hazards: The catalyst will be housed in a reactor and reduced in situ using 20% H2/He to 600C. The catalysts will be typically group VIII metals supported on alumina. A detailed Standard Operating Procedure has been developed for these experiments on the BM line. All sample preparation will be done in the chemistry lab. minimumdays: 3 name: Simon R. Bare new+request: on nonmembers: None unacceptable+dates: Jan 23-Feb 19 Mar 1- Mar 12 Mar 23- Mar 31 April 15 - April 28 #REMOTE_HOST: dplproxy1.internal.uop.com #REMOTE_ADDR: 138.90.1.62 #CONTENT_LENGTH: 1056 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 5.5; Windows NT 4.0)