#################################################### # Simon Bare # requesting 12 days, at minimum=12 days # beamline 33BM, "XAFS study of catalysts" #################################################### # top:/home/www/beamtime-requests/req00412.txt # UNICAT Member Beam Time Request #412 # created Thu Mar 27 23:40:29 CST 2003 #################################################### beamline: 33BM collaboration: Yes collaborator+Jenia: on contact: simon.bare@uop.com days: 12 description: In situ and operando x-ray absorption study of catalysts of interest to UOP. We strongly prefer out time to be allocated in 3 separate periods. Paul: Given the set up time that we need for our experiments we strongly prefer starting our time AFTER a studies day. Given this, these are the dates that we would LIKE: June 3 - 8:00 a.m. June 7 July 8 - 8:00 a.m. July 12 August 5 - 8:00 a.m. August 9 equipment+required: EXAFS detectors experiment: XAFS study of catalysts foreign+nationals: Simon R. Bare hazards: None outside of the envolope that we have already established: temperatures up to 600C, pressures up to 100 psig, flammable gases. minimumdays: 12 name: Simon Bare new+request: on nonmembers: None unacceptable+dates: Paul: Given the set up time that we need for our experiments we strongly prefer starting our time AFTER a studies day. Given this, these are the dates that we would LIKE: June 3 - 8:00 a.m. June 7 July 8 - 8:00 a.m. July 12 August 5 - 8:00 a.m. August 9 There are many times over the summer months where we are unavailable - too many to be listed here. If these dates do not work out in the scheduling, please contact me. Thanks. #REMOTE_HOST: uop.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.27 #CONTENT_LENGTH: 1349 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 5.5; Windows NT 4.0)