#################################################### # Simon Bare # requesting 4 days, at minimum=4 days # beamline 33BM, "In situ EXAFS of catalysts" #################################################### # top:/home/www/beamtime-requests/req00457.txt # UNICAT Member Beam Time Request #457 # created Sun Aug 24 04:30:01 CDT 2003 #################################################### beamline: 33BM collaboration: Yes collaborator_Jenia: ON contact: simon.bare@uop.com days: 4 description: In situ EXAFS/XANES studies of catalysts equipment_required: Standard EXAFS equipment experiment: In situ EXAFS of catalysts foreign_nationals: hazards: These experiments will fall under the existing safety envelope for our in situ XAFS studies minimumdays: 4 name: Simon Bare nonmembers: unacceptable_dates: Paul: The beam time has to coordidnate with our beam time at NSLS and also we have submitted a GU proposal at APS. I do not know these times as yet, but will let you know ASAP. Unfortnately our e-mail has been down due to virus so cannot check some things. However, dates that I know are bad are: October 4, 11, 18, 25-26, 29-30 Movember 7-8, 14-16, 26-30 I will contact you separately with full details later. I appreciate your understanding. z34ID_details: #REMOTE_HOST: usr-10-93-0002a5bf76d3.usd.bessy.de #REMOTE_ADDR: 193.149.10.93 #CONTENT_LENGTH: 903 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 5.01; Windows NT 5.0)