#################################################### # Wenge Yang # requesting 7 days, at minimum=6 days # beamline 34ID-E, In-situ nanoindentation setup and test # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req00546.txt # UNICAT Member Beam Time Request #546 # created Fri Dec 19 15:26:44 CST 2003 #################################################### beamline: 34ID-E collaboration: No contact: yangw@ornl.gov days: 7 description: We have built an in-situ nanoindentation facility in ORNL. The in-situ measurement will be tested. Minor modification may be needed to fit the microbeam station. equipment_required: experiment: In-situ nanoindentation setup and test foreign_nationals: hazards: instrument: 34ID-E microbeam instrument_other: minimumdays: 6 name: Wenge Yang nonmembers: unacceptable_dates: 3/15-3/26, Prefer 2/3-2/9 z34ID_change_undulator: no z34ID_details: z34ID_on_axis: no z34ID_parasitic: yes z34ID_taper: no #REMOTE_HOST: 3dxray.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.123 #CONTENT_LENGTH: 554 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.0; .NET CLR 1.1.4322)