#################################################### # Wenjun Liu # requesting 4 days, at minimum=3 days # beamline 34ID-E, Beamline R&D # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req00602.txt # UNICAT Member Beam Time Request #602 # created Tue Apr 20 13:58:22 CDT 2004 #################################################### beamline: 34ID-E collaboration: No collaborator_Wenjun: ON contact: wjliu@anl.gov days: 4 description: Checking and testing beamline components. Beam focus needs to be optimized. Micromonochromator needs to be recalibrated. CCD needs to be remounted and tested after repair. equipment_required: experiment: Beamline R&D foreign_nationals: hazards: No hazards. instrument: 34ID-E microbeam instrument_other: minimumdays: 3 name: Wenjun Liu nonmembers: unacceptable_dates: needs to put on the 1st week. z34ID_change_undulator: yes z34ID_details: z34ID_on_axis: yes z34ID_parasitic: no z34ID_taper: no #REMOTE_HOST: tea.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.198 #CONTENT_LENGTH: 573 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.0; Hotbar 4.1.8.0; .NET CLR 1.1.4322)