#################################################### # Christoph Rau # requesting 1 days, at minimum=1 days # beamline 34ID-C, Beamline alignment # instrument 34ID-C coherent #################################################### # top:/home/www/beamtime-requests/req00681.txt # UNICAT Member Beam Time Request #681 # created Tue Oct 05 08:16:31 CDT 2004 #################################################### beamline: 34ID-C collaboration: No contact: rau@anl.gov days: 1 description: The beamtime will be used for aligning the beamline and checking the correct functioning of all elements. equipment_required: experiment: Beamline alignment foreign_nationals: hazards: None instrument: 34ID-C coherent instrument_other: minimumdays: 1 name: Christoph Rau nonmembers: unacceptable_dates: Any other than 10/05/2004 z34ID_change_undulator: no z34ID_details: z34ID_parasitic: yes #REMOTE_HOST: arak.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.12 #CONTENT_LENGTH: 443 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; .NET CLR 1.0.3705)