#################################################### # Wenjun Liu # requesting 1 days, at minimum=1 days # beamline 34ID-E, Beamline R&D # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req00749.txt # UNICAT Member Beam Time Request #749 # created Mon Jan 31 11:52:03 CST 2005 #################################################### apsrun: 2004-03 beamline: 34ID-E collaboration: No contact: wjliu@anl.gov days: 1 description: Beamline alignment and optical component test need to be performed in the first day of the run. This ensures the best on-axis measurement for 34ID-C station and off-axis for 34ID-E. equipment_required: experiment: Beamline R&D foreign_nationals: hazards: no hazards instrument: 34ID-E microbeam instrument_other: minimumdays: 1 name: Wenjun Liu nonmembers: unacceptable_dates: 1st day of the APS run 2005-1 z34ID_details: #REMOTE_HOST: tea.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.198 #CONTENT_LENGTH: 495 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.0; Hotbar 4.1.8.0; .NET CLR 1.1.4322)