#################################################### # Ian Robinson # requesting 6 days, at minimum=4 days # beamline 34ID-C, Coherent diffraction calibrations on myosin # instrument 34ID-C coherent #################################################### # top:/home/www/beamtime-requests/req00804.txt # UNICAT Member Beam Time Request #804 # created Sat Apr 23 16:21:44 CDT 2005 #################################################### apsrun: 2005-02 beamline: 34ID-C collaboration: Yes contact: ikr@uiuc.edu days: 6 description: During the coming shutdown we plan to install translation on the Be window at the front of the C hutch. This will allow us to move it while watching the result of a CXD experiment. Qun Shen plans to look at some dried myosin samples during the period requested. equipment_required: KB mirrors experiment: Coherent diffraction calibrations on myosin foreign_nationals: hazards: Biological samples (non-human) will be removed instrument: 34ID-C coherent instrument_other: minimumdays: 4 name: Ian Robinson new_request: ON nonmembers: unacceptable_dates: Needs to be last week of June z34ID_change_undulator: no z34ID_details: Biological sample will last longer in parasitic time z34ID_parasitic: yes #REMOTE_HOST: adsl-69-214-224-237.dsl.chmpil.ameritech.net #REMOTE_ADDR: 69.214.224.237 #CONTENT_LENGTH: 765 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1)