#################################################### # Gene E. Ice # requesting 6 days, at minimum=4 days # beamline 34ID-E, Sn Whisker Strain and Orientation # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req00832.txt # UNICAT Member Beam Time Request #832 # created Fri Aug 19 08:18:49 CDT 2005 #################################################### apsrun: 2005-03 beamline: 34ID-E collaboration: No collaborator_Wenjun: ON contact: IceGE@ornl.gov days: 6 description: We will follow up measurements of Sn whisker growth with further experiments aimed at understanding mass transport required for whisker growth. We propose 3 days of parasitic time followed by 3 days of dedicated time for these measurements. equipment_required: experiment: Sn Whisker Strain and Orientation foreign_nationals: Su Peng hazards: None instrument: 34ID-E microbeam instrument_other: minimumdays: 4 name: Gene E. Ice nonmembers: submit: Submit unacceptable_dates: Oct 7-15 Oct 20-23 Oct 27 Nov 10-14 Nov 22-30 z34ID_change_undulator: no z34ID_details: We can use 2-3 days of parastic time to map out interesting regions of the sample for study. We will then use dedicated time for detailed measurements of strain. z34ID_on_axis: no z34ID_parasitic: yes z34ID_taper: no #REMOTE_HOST: icegeg4.ornl.gov #REMOTE_ADDR: 160.91.157.187 #CONTENT_LENGTH: 885 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/5.0 (Macintosh; U; PPC Mac OS X Mach-O; rv:1.7.3) Gecko/20040913 Firefox/0.10