#################################################### # Christoph Rau # requesting 2 days, at minimum=1 days # beamline 34ID-C, alignment beamline + 30micron focus with KB system # instrument 34ID-C tomography #################################################### # top:/home/www/beamtime-requests/req00901.txt # UNICAT Member Beam Time Request #901 # created Wed Dec 07 17:20:18 CST 2005 #################################################### apsrun: 2006-01 beamline: 34ID-C collaboration: Yes collaborator_Wenjun: ON contact: rau@anl.gov days: 2 description: 1 day for the alignment of the beamline at the begining of the run. 1 day to make a test with the KB system: I want to know if it is possible to make a 30 micron focus with the KB system, putting a diffracting object 2-3m in front of the mirror. This is of importance for the further development of the microscope. equipment_required: KB system CCD camera experiment: alignment beamline + 30micron focus with KB system foreign_nationals: hazards: none instrument: 34ID-C tomography instrument_other: minimumdays: 1 name: Christoph Rau nonmembers: submit: Submit unacceptable_dates: any other than beginning of run z34ID_change_undulator: no z34ID_details: z34ID_parasitic: yes #REMOTE_HOST: arak.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.12 #CONTENT_LENGTH: 783 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; .NET CLR 1.0.3705)