#################################################### # Jan Ilavsky # requesting 3 days, at minimum=2 days # beamline 33ID, USAXS setup and testing # instrument 33ID-D USAXS #################################################### # top:/home/www/beamtime-requests/req00956.txt # UNICAT Member Beam Time Request #956 # created Wed Apr 19 13:55:16 CDT 2006 #################################################### apsrun: 2006-02 beamline: 33ID collaboration: Yes contact: ilavsky@aps.anl.gov days: 3 description: Need few days (2-3) for testing of new hardware on USAXS. USAXS will get epix brick and new control computer, which need to be tested and performance needs to be verified BEFORE general user program can be really run. We just need to do quality cointrol... equipment_required: experiment: USAXS setup and testing foreign_nationals: hazards: instrument: 33ID-D USAXS instrument_other: minimumdays: 2 name: Jan Ilavsky nonmembers: submit: Submit unacceptable_dates: This experiment should eb done BEFORE any other USAXS experiment to guarrantee instrument performance. z34ID_details: #REMOTE_HOST: uni192.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.192 #CONTENT_LENGTH: 663 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.8.0.2) Gecko/20060308 Firefox/1.5.0.2