#################################################### # Jan Ilavsky # requesting 1-3 shifts days, at minimum=1 shift, 2 shifts after USAXS imaging days # beamline 33ID, USAXs setup # instrument 33ID-D USAXS #################################################### # top:/home/www/beamtime-requests/req00958.txt # UNICAT Member Beam Time Request #958 # created Wed Apr 19 13:57:14 CDT 2006 #################################################### apsrun: 2006-02 beamline: 33ID collaboration: Yes contact: ilavsky@aps.anl.gov days: 1-3 shifts description: Before each USAXS block - and after USAXS imaging we should put 1-3 shifts of setup or so of setup time so the USAXS setup does not encroach into GU assigned beam time. equipment_required: experiment: USAXs setup foreign_nationals: hazards: instrument: 33ID-D USAXS instrument_other: minimumdays: 1 shift, 2 shifts after USAXS imaging name: Jan Ilavsky nonmembers: submit: Submit unacceptable_dates: Schedule before each USAXS block. z34ID_details: #REMOTE_HOST: uni192.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.192 #CONTENT_LENGTH: 536 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.8.0.2) Gecko/20060308 Firefox/1.5.0.2