#################################################### # p zschack # requesting 4 days, at minimum=4 days # beamline 33ID, DCM vibration and Newport studies # instrument 33ID-D kappa #################################################### # top:/home/www/beamtime-requests/req01009.txt # UNICAT Member Beam Time Request #1009 # created Wed Jul 12 08:12:57 CDT 2006 #################################################### apsrun: 2006-02 beamline: 33ID collaboration: Yes collaborator_Paul: ON contact: zschack@anl.gov days: 4 description: XSD engineers suggest specific measurements tro help understand DCM vibration issues. Newport development to continue using thin-film samples. equipment_required: experiment: DCM vibration and Newport studies foreign_nationals: hazards: instrument: 33ID-D kappa instrument_other: minimumdays: 4 name: p zschack nonmembers: submit: Submit unacceptable_dates: schedule for 12-16 july z34ID_details: #REMOTE_HOST: pit.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.43 #CONTENT_LENGTH: 491 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.7.3) Gecko/20040910