#################################################### # p zschack # requesting 2 days, at minimum=2 days # beamline 33BM, thin flm scattering (including beam line set up) # instrument 33BM-C fourc #################################################### # top:/home/www/beamtime-requests/req01012.txt # UNICAT Member Beam Time Request #1012 # created Wed Jul 26 10:14:38 CDT 2006 #################################################### apsrun: 2006-02 beamline: 33BM collaboration: Yes collaborator_Paul: ON contact: zschack@anl.gov days: 2 description: recover from Pulak Dutta run and measure TE film scattering equipment_required: experiment: thin flm scattering (including beam line set up) foreign_nationals: hazards: no unusual hazards instrument: 33BM-C fourc instrument_other: minimumdays: 2 name: p zschack nonmembers: submit: Submit unacceptable_dates: must be 26-28 july z34ID_details: #REMOTE_HOST: gbg.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.83 #CONTENT_LENGTH: 444 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.7.6) Gecko/20050223 Firefox/1.0.1