#################################################### # Jon Tischler # requesting 6 days, at minimum=5 days # beamline 33ID, PLD # instrument 33ID-D laser #################################################### # top:/home/www/beamtime-requests/req01039.txt # UNICAT Member Beam Time Request #1039 # created Fri Aug 25 14:57:12 CDT 2006 #################################################### apsrun: 2006-03 beamline: 33ID collaboration: Yes collaborator_Paul: ON contact: TischlerJZ@ornl.gov days: 6 description: Pulsed Laser Deposition equipment_required: All the laser stuff, and a CCD (the Mar we used last time was nice) experiment: PLD foreign_nationals: hazards: the usual with the laser instrument: 33ID-D laser instrument_other: minimumdays: 5 name: Jon Tischler nonmembers: submit: Submit unacceptable_dates: For Jon: Oct 7; Nov 21-24; Dec 2-3; Dec 5 (BAC); Dec 8-13 (DOE review @ ORNL) For Gyula: Dec 1-7 (MRS); Dec 8-13 (DOE review @ ORNL) z34ID_details: #REMOTE_HOST: tischler.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.20 #CONTENT_LENGTH: 600 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/5.0 (Macintosh; U; PPC Mac OS X; en) AppleWebKit/418.8 (KHTML, like Gecko) Safari/419.3