#################################################### # Ian Robinson # requesting 6 days, at minimum=4 days # beamline 34ID-C, X-ray ptychography of InAs Quantun Dot samples # instrument 34ID-C coherent #################################################### # top:/home/www/beamtime-requests/req01134.txt # UNICAT Member Beam Time Request #1134 # created Sun Apr 29 11:38:59 CDT 2007 #################################################### apsrun: 2007-02 beamline: 34ID-C collaboration: Yes contact: i.robinson@ucl.ac.uk days: 6 description: Pre-fabricated samples of InAs QD's grown on sapphire substrates will be put in the beam. Samples will be removed after the run. We need the air-position diffractometer, KB mirrors and CCD detectors. equipment_required: experiment: X-ray ptychography of InAs Quantun Dot samples foreign_nationals: hazards: none instrument: 34ID-C coherent instrument_other: minimumdays: 4 name: Ian Robinson new_request: ON nonmembers: submit: Submit unacceptable_dates: I plan to be at APS during the following dates: June 20 - July 11, but will be away at a conference July 25-28 July 25 - 31 All assigned runs (including the GUP time) will need to fall in this period. z34ID_details: z34ID_parasitic: yes #REMOTE_HOST: host81-154-224-20.range81-154.btcentralplus.com #REMOTE_ADDR: 81.154.224.20 #CONTENT_LENGTH: 802 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-GB; rv:1.8.0.11) Gecko/20070312 Firefox/1.5.0.11