#################################################### # Wenjun Liu # requesting 3 days, at minimum=2 days # beamline 34ID-E, Beamline alignment and new KB mirror evaluation # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req01140.txt # UNICAT Member Beam Time Request #1140 # created Mon Apr 30 13:01:09 CDT 2007 #################################################### apsrun: 2007-02 beamline: 34ID-E collaboration: Yes collaborator_Wenjun: ON contact: wjliu@anl.gov days: 3 description: Beamline alignment needs to be performed. This ensures the best on-axis measurement for 34-ID-C station and off-axis for 34-ID-E. A new set of KB mirror pair needs to be evaluated at 34-ID-E. equipment_required: experiment: Beamline alignment and new KB mirror evaluation foreign_nationals: hazards: no hazardous instrument: 34ID-E microbeam instrument_other: minimumdays: 2 name: Wenjun Liu nonmembers: submit: Submit unacceptable_dates: they need to be at the beginning of the run cycle. z34ID_change_undulator: yes z34ID_details: For the first day, parasitic operations in the C station will be prevented when performing beamline alignment . z34ID_on_axis: yes z34ID_parasitic: no z34ID_taper: no #REMOTE_HOST: tea.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.198 #CONTENT_LENGTH: 812 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1)