#################################################### # Wenjun Liu # requesting 3 days, at minimum=2 days # beamline 34ID-E, Beamline alignment and new KB mirror evaluation # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req01174.txt # UNICAT Member Beam Time Request #1174 # created Wed Aug 29 14:01:52 CDT 2007 #################################################### apsrun: 2007-03 beamline: 34ID-E collaboration: No collaborator_Wenjun: ON contact: wjliu@anl.gov days: 3 description: Beamline alignment needs to be performed. This ensures the best on-axis measurement for 34-ID-C station and off-axis for 34-ID-E. A new KB mirror pair needs to be evaluated at 34-ID-E. (Only parasitic beam time will be needed) equipment_required: experiment: Beamline alignment and new KB mirror evaluation foreign_nationals: hazards: instrument: 34ID-E microbeam instrument_other: minimumdays: 2 name: Wenjun Liu nonmembers: submit: Submit unacceptable_dates: z34ID_details: z34ID_parasitic: yes #REMOTE_HOST: tea.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.198 #CONTENT_LENGTH: 615 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1)