#################################################### # Wenjun Liu # requesting 3 days, at minimum=3 days # beamline 34ID-E, Beamline alignment and evaluation of new KB mirrors # instrument 34ID-E microbeam #################################################### # top:/home/www/beamtime-requests/req01206.txt # UNICAT Member Beam Time Request #1206 # created Wed Jan 02 17:01:25 CST 2008 #################################################### apsrun: 2008-01 beamline: 34ID-E collaboration: No collaborator_Wenjun: ON contact: wjliu@anl.gov days: 3 description: Beamline alignment needs to be performed. This ensures the best on-axis measurement for 34-ID-C station and off-axis for 34-ID-E. Two sets of KB mirrors (Au on spherical and Pt on flat substrates) need to be evaluated at 34-ID-E. equipment_required: experiment: Beamline alignment and evaluation of new KB mirrors foreign_nationals: hazards: no instrument: 34ID-E microbeam instrument_other: minimumdays: 3 name: Wenjun Liu nonmembers: submit: Submit unacceptable_dates: Acceptable dates: Jan. 29 - Feb. 1, 2008 z34ID_change_undulator: yes z34ID_details: z34ID_on_axis: yes z34ID_parasitic: no z34ID_taper: no #REMOTE_HOST: tea.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.198 #CONTENT_LENGTH: 729 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1)