#################################################### # ross harder # requesting days, at minimum= days # beamline 34ID-C, beam stability # instrument 34ID-C coherent #################################################### # top:/home/www/beamtime-requests/req01235.txt # UNICAT Member Beam Time Request #1235 # created Fri May 09 17:33:17 CDT 2008 #################################################### apsrun: 2008-02 beamline: 34ID-C collaboration: Yes contact: rharder@aps.anl.gov days: description: I would like a shift to investigate the stability of the beam in 34ID-C as a function of the total power onto the beam splitting mirror. This will involve closing the outboard L5 slit and blocking the beam to the end station. This would be best accomplished at the beginning of the run during the setup period. equipment_required: experiment: beam stability foreign_nationals: hazards: instrument: 34ID-C coherent instrument_other: minimumdays: name: ross harder nonmembers: submit: Submit unacceptable_dates: z34ID_change_undulator: yes z34ID_details: z34ID_parasitic: no #REMOTE_HOST: ngo.uni.aps.anl.gov #REMOTE_ADDR: 164.54.216.88 #CONTENT_LENGTH: 650 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Opera/9.50 (X11; Linux i686; U; en)