#################################################### # Simon R. Bare # requesting 5 days, at minimum=5 days # beamline 33BM, Final in situ XAFS experiments of catalysts at 33BM :( # instrument 33BM-B XAFS #################################################### # top:/home/www/beamtime-requests/req01248.txt # UNICAT Member Beam Time Request #1248 # created Mon Sep 08 08:41:03 CDT 2008 #################################################### apsrun: 2008-03 beamline: 33BM collaboration: Yes collaborator_Jenia: ON contact: simon.bare@uop.com days: 5 description: These will be the final in situ catalysis XAFS experiments at 33BM. We will be collecting XAFS data of numerous catalysts at different temperatures during reduction and sulfiding. equipment_required: Full EXAFS equipment experiment: Final in situ XAFS experiments of catalysts at 33BM :( foreign_nationals: hazards: These experiments fall under our standard safety envelope. instrument: 33BM-B XAFS instrument_other: minimumdays: 5 name: Simon R. Bare nonmembers: Shelly Kelly submit: Submit unacceptable_dates: Simon: We should be able to work this out. In fact, the flat crystals are already mounted, so no additional DCM access would be required. Paul Bare, Simon R wrote: Paul: Having gone through this with George and Nan we believe that the best time for us would be towards the beginning of the run. The only difficulty is that we have our annual 3-day technical meeting also at the beginning so the earliest that we could start is Monday Oct 6 - which does not neatly fall into a studies day. If I requested the period October 8 - October 14 would this be a problem? Thanks for your understanding. z34ID_details: #REMOTE_HOST: tmpnat1.honeywell.com #REMOTE_ADDR: 199.64.0.252 #CONTENT_LENGTH: 1292 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; SV1; .NET CLR 1.1.4322; InfoPath.1)