#################################################### # Wenjun Liu # requesting 7 days, at minimum=7 days # beamline 34ID-E, 34-ID-E PerkinElmer detector system EPICS control (02/09/2009 8:00am - 02/16/2009 8:00am) # instrument 34ID-E microbeam #################################################### # leo:~web33/beamtime-requests/req01267.txt # Internal Beam Time Request #1267 # created Thu Feb 12 15:05:26 -0600 2009 #################################################### apsrun: 2009-01 beamline: 34ID-E collaboration: No collaborator_Wenjun: ON contact: wjliu@anl.gov days: 7 description: Tests on BCDA software for the 34-ID-E 3D microscopy new PE detector system will be performed from 02/09/2009 8:00am until 02/16/2009 8:00am. PE detectors need to be run for a week for reliability and speed performance test. Hutch access activities are allowed. equipment_required: experiment: 34-ID-E PerkinElmer detector system EPICS control (02/09/2009 8:00am - 02/16/2009 8:00am) foreign_nationals: hazards: instrument: 34ID-E microbeam instrument_other: minimumdays: 7 name: Wenjun Liu nonmembers: submit: Submit unacceptable_dates: z34ID_change_undulator: no z34ID_details: z34ID_on_axis: no z34ID_parasitic: yes z34ID_taper: no #REMOTE_HOST: tea.xor.aps.anl.gov #REMOTE_ADDR: 164.54.124.198 #CONTENT_LENGTH: 770 #HTTP_REFERER: http://www.aps.anl.gov/Sectors/33_34/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 5.1; .NET CLR 1.1.4322; .NET CLR 2.0.50727)