#################################################### # ross harder # requesting 15 days, at minimum= days # beamline 34ID-C, diffractometer upgrade # instrument 34ID-C coherent #################################################### # leo:~web33/beamtime-requests/req01269.txt # Internal Beam Time Request #1269 # created Mon Mar 02 16:51:24 -0600 2009 #################################################### apsrun: 2009-01 beamline: 34ID-C collaboration: Yes contact: rharder@aps.anl.gov days: 15 description: An upgrade to the diffractometer detector arm will be done. CXD will be measured from gold particals on silicon to test the instrumentation. equipment_required: experiment: diffractometer upgrade foreign_nationals: hazards: instrument: 34ID-C coherent instrument_other: minimumdays: name: ross harder nonmembers: Dan Legnini submit: Submit unacceptable_dates: z34ID_change_undulator: no z34ID_details: z34ID_on_axis: no z34ID_parasitic: yes z34ID_taper: no #REMOTE_HOST: cxd2.xor.aps.anl.gov #REMOTE_ADDR: 164.54.125.57 #CONTENT_LENGTH: 531 #HTTP_REFERER: http://www.aps.anl.gov/Sectors/33_34/admin/unireq.html #HTTP_USER_AGENT: Mozilla/5.0 (Macintosh; U; Intel Mac OS X 10_5_6; en-us) AppleWebKit/525.27.1 (KHTML, like Gecko) Version/3.2.1 Safari/525.27.1