#################################################### # Wenjun Liu # requesting 7 days, at minimum=5 days # beamline 34ID-E, Alio XYZ stage commissioning # instrument 34ID-E microbeam #################################################### # leo:~web33/beamtime-requests/req01283.txt # Internal Beam Time Request #1283 # created Thu May 07 15:01:30 -0500 2009 #################################################### apsrun: 2009-02 beamline: 34ID-E collaboration: No collaborator_Wenjun: ON contact: wjliu@anl.gov days: 7 description: Alio ceramic motor XYZ stage needs commissioning for the development of wire scan technique at 34-ID-E beamline. The performance and reliability will be tested. equipment_required: experiment: Alio XYZ stage commissioning foreign_nationals: hazards: no instrument: 34ID-E microbeam instrument_other: minimumdays: 5 name: Wenjun Liu nonmembers: submit: Submit unacceptable_dates: it's better to be scheduled at the end of run cycle. 1-2 days of contoled time will be required. z34ID_details: z34ID_parasitic: yes #REMOTE_HOST: tea.xor.aps.anl.gov #REMOTE_ADDR: 164.54.124.198 #CONTENT_LENGTH: 606 #HTTP_REFERER: http://www.aps.anl.gov/Sectors/33_34/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 8.0; Windows NT 5.1; Trident/4.0; .NET CLR 1.1.4322; .NET CLR 2.0.50727; .NET CLR 3.0.4506.2152; .NET CLR 3.5.30729)