#################################################### # David Black # requesting 8 days, at minimum=6 days # beamline 33BM, "X-ray topography of LiAlO2" #################################################### # top:/home/www/beamtime-requests/req00328.txt # UNICAT Member Beam Time Request #328 # created Mon Dec 09 14:55:53 CST 2002 #################################################### beamline: 33BM collaboration: No collaborator+Jenia: on contact: david.black@nist.gov days: 8 description: This experiment requires two beam periods, of 3-4 days each, separated by a few weeks. We plan to record baseline topographs of LiAlO2 substates before deposition of epitaxial films. Epitaxial films will be grown and removed from the substrates and examined in the subsequent beam period. NOTE: I would like to run with symmetric optics in the monochromator and the rotating phase object in the hutch. equipment+required: Darkroom experiment: X-ray topography of LiAlO2 foreign+nationals: hazards: minimumdays: 6 name: David Black nonmembers: Norman Sanford, Paul Maruska unacceptable+dates: All of February March 13,14,21,22 April 12-21 #REMOTE_HOST: linoleum.nist.gov #REMOTE_ADDR: 129.6.180.22 #CONTENT_LENGTH: 765 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.73C-CCK-MCD {C-UDP; EBM-APPLE} (Macintosh; U; PPC)