#################################################### # Simon Bare # requesting 5 days, at minimum=5 days # beamline 33BM, EXAFS of catalysts # instrument 33BM-B XAFS #################################################### # top:/home/www/beamtime-requests/req00509.txt # UNICAT Member Beam Time Request #509 # created Fri Dec 05 09:57:57 CST 2003 #################################################### beamline: 33BM collaboration: Yes collaborator_Jenia: ON contact: simon.bare@uop.com days: 5 description: In situ and ex situ studies of catalysts and adsorbents equipment_required: Standard EXAFS equipment experiment: EXAFS of catalysts foreign_nationals: hazards: experiments will fall within the existing SOP instrument: 33BM-B XAFS instrument_other: minimumdays: 5 name: Simon Bare nonmembers: unacceptable_dates: Many - due to scheduling time at 3 different beam lines, and 3 schedules. There is a block of operations time March 10 - March 22. Joe Woicik and I would like to divide this time up between us for EXAFS. Joe would have time March 10- March 16 and we would follow frm March 16 - March 22. z34ID_details: #REMOTE_HOST: Host 2.4.90.138.in-addr.arpa not found: 2(SERVFAIL) #REMOTE_ADDR: 138.90.4.2 #CONTENT_LENGTH: 700 #HTTP_REFERER: http://www.uni.aps.anl.gov/unireq.htm #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 5.5; Windows NT 4.0)