#################################################### # Simon Bare # requesting 4 days, at minimum=4 days # beamline 33BM, In situ XAFS of catalysts # instrument 33BM-B XAFS #################################################### # top:/home/www/beamtime-requests/req01059.txt # UNICAT Member Beam Time Request #1059 # created Tue Aug 29 11:16:46 CDT 2006 #################################################### apsrun: 2006-03 beamline: 33BM collaboration: Yes collaborator_Jenia: ON contact: simon.bare@uop.com days: 4 description: In situ EXAFS studies of supported heterogeneous catalysts. Paul: We are requesting time at the very beginning of the cycle and towards the end of the cycle. We hope that this makes the scheduling easier for the XAFS time. Our strongly preferred time is 4 days in the period October 1 - 9. equipment_required: Standard EXAFS equipment experiment: In situ XAFS of catalysts foreign_nationals: None hazards: The usual hazards associated with our in situ experiments: gases, temperature, pressure etc. Full details will be provided on the SAF. instrument: 33BM-B XAFS instrument_other: minimumdays: 4 name: Simon Bare nonmembers: None submit: Submit unacceptable_dates: October 9-30 November 1-27 December 11-21 z34ID_details: #REMOTE_HOST: tmpnat1.honeywell.com #REMOTE_ADDR: 199.64.0.252 #CONTENT_LENGTH: 854 #HTTP_REFERER: http://www.uni.aps.anl.gov/admin/unireq.html #HTTP_USER_AGENT: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; SV1; .NET CLR 1.1.4322; InfoPath.1)